( ISSN 2277 - 9809 (online) ISSN 2348 - 9359 (Print) ) New DOI : 10.32804/IRJMSH

Impact Factor* - 6.2311


**Need Help in Content editing, Data Analysis.

Research Gateway

Adv For Editing Content

   No of Download : 54    Submit Your Rating     Cite This   Download        Certificate

PROFIT ANALYSIS OF PROGRAMMABLE LOGICAL CONTROL (PLC) SYSTEM WITH EXPERT REPAIRMAN

    2 Author(s):  SANJEEV KUMAR , JUGMENDRA SINGH

Vol -  6, Issue- 10 ,         Page(s) : 227 - 241  (2015 ) DOI : https://doi.org/10.32804/IRJMSH

Abstract

This paper deals with cost-benefit analysis of programmable logical control (PLC) system, which are generally used in the modern industries. In this model, we have considered that system is basically three parts i.e. mechanical part (M), software (S) and control processing unit (H) and two repairman. One is ordinary repairman and other expert repairman. Initially, ordinary repairman starts the repair of failed unit, if he is not able to repair the failed unit then he will discuss with the expert repairman. The failure time distributions of components are taken exponential whereas the repair time distribution are general. Using regenerative point technique, important measures of system effectiveness are obtained. The results are also analyzed through graphs in a particular case when repair time distributions are also exponential.

Arora, N. and Kumar, D. (2000) System Analysis and Maintenance management for coal handling system in paper plant. IJOMAS, 16(2), 156-173. 
2. Attahiru Sule Alfa W.L. and Zhao,Y.Q. (1998) Stochastic analysis of a repairable system with three units and repair facilities. Microelectron. Reliab., 38(4), 585-595. 
3. Gupta, R. and Varshney, G. (2004) Reliability analysis of gas leakage detection system in an industrial workshop with the application of Boolen function technique Alligarh J. of Statistics, 24, 107-119. 
4. Rander, M.C., Kumar, A. and Tuteja, R.K. (1991) A two-unit cold standby system with major and minor failures and preparation time in the case of major failure, Microelectron Reliab., 32, 1199-1204. 
5. Rander, M.C., Kumar, S. and Kumar, A. (1994) Cost analysis of two dissimilar cold standby system with preventive maintenance and replacement of standby, Microelectron. Reliab., 34(7), 171-174. 
6. Rizwan, S.M. and Taneja, G. (2000) Profit Analysis of a System with Perfect Repair at Partial Failure or complete failure, Pure Applied Mathematika Sciences, LII(1-2), 7-14. 
7. Kumar, A and Kumar, S. (2008) Stochastic analysis of a single unit redundant system with two kinds of failure and repair‘ Reflections des ERA-JMS, Vol. 3 Issue 2, PP. 115-134. 
8. Bhardwaj, N., Kumar, A., and Kumar, S. (2009) Analysis of Two-Unit Redundant System with Imperfect Switching and Connection Time‘ International Transactions in Mathematical Sciences and Compute, July– December Volume. No.2, pp.195 – 202 

*Contents are provided by Authors of articles. Please contact us if you having any query.






Bank Details