Arora, N. and Kumar, D. (2000) System Analysis and Maintenance management for coal handling system in paper plant. IJOMAS, 16(2), 156-173.
2. Attahiru Sule Alfa W.L. and Zhao,Y.Q. (1998) Stochastic analysis of a repairable system with three units and repair facilities. Microelectron. Reliab., 38(4), 585-595.
3. Gupta, R. and Varshney, G. (2004) Reliability analysis of gas leakage detection system in an industrial workshop with the application of Boolen function technique Alligarh J. of Statistics, 24, 107-119.
4. Rander, M.C., Kumar, A. and Tuteja, R.K. (1991) A two-unit cold standby system with major and minor failures and preparation time in the case of major failure, Microelectron Reliab., 32, 1199-1204.
5. Rander, M.C., Kumar, S. and Kumar, A. (1994) Cost analysis of two dissimilar cold standby system with preventive maintenance and replacement of standby, Microelectron. Reliab., 34(7), 171-174.
6. Rizwan, S.M. and Taneja, G. (2000) Profit Analysis of a System with Perfect Repair at Partial Failure or complete failure, Pure Applied Mathematika Sciences, LII(1-2), 7-14.
7. Kumar, A and Kumar, S. (2008) Stochastic analysis of a single unit redundant system with two kinds of failure and repair‘ Reflections des ERA-JMS, Vol. 3 Issue 2, PP. 115-134.
8. Bhardwaj, N., Kumar, A., and Kumar, S. (2009) Analysis of Two-Unit Redundant System with Imperfect Switching and Connection Time‘ International Transactions in Mathematical Sciences and Compute, July– December Volume. No.2, pp.195 – 202